魁北克省薩格奈–(Newsfile Corp. – 2022年11月15日) – First Phosphate Corp. (“First Phosphate”或“本公司”)欣然宣布其位於薩格奈市以北110公裏處的Lac à l’Orignal項目的礦產資源量估測(“MRE”)和礦物加工測試工作的結果。礦產資源量估測(“MRE”)由P&E Mining Consultants Inc.的專業地質學家M. Antoine Yassa編制,他是符合加拿大證券管理機構《國家文書43-101:礦產項目披露標准》(“NI 43-101”)規定的獨立合資格人士,生效日期為2022年10月3日。
本公司已申請在加拿大證券交易所(“CSE”)上市。First Phosphate總裁Peter Kent表示,“今天的公告是First Phosphate完成北美磷酸鐵鋰(LFP)電池行業六階段發展計劃的標志性一步。該項目的礦產資源量估測是我們執行第一階段計劃的關鍵,即實施一個完全符合ESG標准的露天礦,並有可能生產出磷酸鐵鋰(LFP)電池行業所需的高純度磷酸鹽材料。”
Forward-Looking Information and Cautionary Statements
Certain information in this news release constitutes forward-looking statements under applicable securities laws. Any statements that are contained in this news release that are not statements of historical fact may be deemed to be forward-looking statements. Forward-looking statements are often identified by terms such as “may”, “should”, “anticipate”, “expect”, “potential”, “believe”, “intend” or the negative of these terms and similar expressions. Forward-looking statements in this news release include statements relating to: the Company’s focus on integrating its phosphate material directly into the supply chain of major battery and electric vehicle producers in North America; the Company’s future development plans of its Saguenay region claims; the Company’s completion of the first stage of its project has the potential to produce high purity phosphate concentrate that is a necessary material for the LFP battery industry; statements and information with respect to the exploration and development potential of the Lac à l’Orignal Property and the conversion of Inferred Mineral Resources into Measured and Indicated Mineral Resources, future opportunities for enhancing development at Lac à l’Orignal Property, and timing for the release of the Company’s disclosure in connection with the foregoing.
Forward-looking information in this press release are based on certain assumptions and expected future events, namely: the Company will focus on integrating its phosphate material directly into the supply chain of major battery and electric vehicle producers in North America; the Company will develop its Saguenay region claims; the Company’s completion of the first stage of its project will have potential to produce high purity phosphate concentrate that such material will be a necessary material for the LFP battery industry; the accuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates), phosphate price, exchange rates, fuel and energy costs, future economic conditions, anticipated future estimates of free cash flow, and courses of action by the Company.
These statements involve known and unknown risks, uncertainties and other factors, which may cause actual results, performance or achievements to differ materially from those expressed or implied by such statements, including but not limited to: the Company’s inability develop its Saguenay region claims; the Company’s completion of the first stage of its project’s inability to produce high purity phosphate concentrate and/or that such material will not be a necessary material for the LFP battery industry; the inaccuracy of Mineral Reserve and Mineral Resource Estimates (including, but not limited to, ore tonnage and ore grade estimates), adverse changes to phosphate price, exchange rates, fuel and energy costs, future economic conditions, anticipated future estimates of free cash flow, and courses of action by the Company.
Forward-looking statements contained in this press release are expressly qualified by this cautionary statement and reflect the Company’s expectations as of the date hereof and are subject to change thereafter. The Company undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, estimates or opinions, future events or results or otherwise or to explain any material difference between subsequent actual events and such forward-looking information, except as required by applicable law.