Fission Hits 61.09m total composite >10,000 cps with Metallurgical Drilling at R780E Zone Aug 14, 2017
Fission Hits Widest Mineralization to Date Outside of the R780E Zone with 1.5km Step Out from Triple R Deposit Aug 1, 2017
Fission Uranium – First Two Summer Holes at R1515W Hit Wide Mineralization in Multiple Stacked Lenses and High-Grade Intervals Jul 25, 2017
Fission Confirms High-Grades at 1515W Zone and Mineralized Area 120m West of New Zone Jun 5, 2017 Mining
Fission Confirms R1515W Zone with 2nd Well-Mineralized Hole: 48.0m Total Composite Mineralization, Including 4.44m Total Composite >10,000 cps Apr 5, 2017 Mining
510m Step Out Discovers New High-Grade Zone at Fission’s PLS; Athabasca Basin’s Largest Mineralized Trend now 3.14km Mar 21, 2017 Mining