VANCOUVER, BC / ACCESSWIRE / April 18, 2024 / Banyan Gold Corp. (the “Company” or “Banyan“) (TSXV:BYN)(OTCQB:BYAGF) is pleased to announce the 2024 exploration and technical program at its AurMac Project located in the Mayo Mining district (“AurMac“), approximately 40 kilometres (“km“) northeast from the village of Mayo, Yukon and 356 km north of Whitehorse, Yukon. Additionally, Banyan has also commenced further metallurgical work, engineering and environmental baseline programs to advance the Project to support future economic studies and permit applications.
Highlights:
“AurMac is well positioned in this current gold price environment with a 7 million ounce gold Resource, with near surface mineralization and with existing road and hydro power infrastructure on the Property,” stated Tara Christie, President and CEO. “In 2024, Banyan will continue to add value through drilling, metallurgy, and engineering to prepare to demonstrate project economics and for the Project to be advanced rapidly and efficiently.”
2024 Exploration Update
Banyan plans to initiate its 2024 exploration program in May 2024 and will deploy two (2) drills. Drilling objectives will include: infill drilling of higher grade near surface zone within the Powerline Zone; testing mineralized structures and lithological horizons controlling the east-west grade continuity within the Powerline deposit; test areas identified for potential infrastructure; and importantly will target the extension of previously defined gold mineralization at the Airstrip Deposit, which has not been drill tested since 2020.
Metallurgy Program Update
Banyan has commenced additional follow-up metallurgical studies with Forte Analytical, LLC in Fort Collins, Colorado and Base Metallurgical Laboratories Ltd. in Kamloops, British Columbia, towards the optimization of the three conventional mining processes including CIP/CIL, flotation and heap leaching identified in the February 6, 2024, news release. Testwork will focus on optimization of gold recoveries through expanded test work designed to evaluate various grind sizes and reagent rates along with combination of gravity recovery in the mill process flow sheets. Additionally, amenability to pre-concentration test work is being conducted to support future trade off studies.
Internal Project Scoping and Engineering
Banyan has been working with engineering consultants to initiate internal scoping and engineering investigations to support the evaluation of the three conventional mining processes including CIP/CIL, flotation, and heap leaching, identified in the February 6, 2024, news release. The initial Project evaluations will incorporate various throughputs for each process flowsheet and will utilise the results from the Phase 1 and ongoing metallurgy programs to support definition of the operational parameters used for future economic studies. Moreover, the scoping studies will be used to outline areas for initial engineering field investigations of potential mine infrastructure.
Environmental Baseline Update
Banyan has been conducting environmental baseline studies for the AurMac Project since 2021 through the collection of surface water quality, hydrological and meteorological information to compliment the robust data set collected by Hecla Mining Company and Victoria Gold Corp. from their ongoing mining operations on adjacent properties. Banyan will expand the environmental baseline programs for the AurMac Project in the summer of 2024 inclusive of groundwater investigations to support future permit applications and economic studies.
Qualified Persons
Paul D. Gray, P.Geo., is a “Qualified Person” as defined under NI 43-101, and has reviewed and approved the content of this news release Mr. Gray is Banyan Gold’s geological consultant and has verified the data disclosed in this news release, including the sampling, analytical and test data underlying the information.
Upcoming Events
About Banyan
Banyan’s primary asset, the AurMac Project is adjacent to Victoria Gold’s Eagle Gold Mine, in Canada’s Yukon Territory. The current inferred MRE for the AurMac Project of 7.0 million ounces has an effective date of February 6, 2024.
The 173 square kilometres (“sq km”) AurMac Project lies 30 km from Victoria Gold’s Eagle Project and adjacent to Hecla Mining’s high grade Keno Hill Silver mine. The AurMac Project is transected by the main Yukon highway and access road to the Victoria Gold open-pit, heap leach Eagle Gold mine. The AurMac Project benefits from a 3-phase powerline, existing power station and cell phone coverage. Banyan has the right to earn up to a 100% interest, in both the Aurex and McQuesten Properties respectively, subject to certain royalties.
The inferred MRE for the AurMac Project was prepared on February 6, 2024, and consisted of 7,003,000 ounces of gold (see Table 1) hosted within near surface, road accessible pit constrained Mineral Resources contained in two near/on-surface deposits: the Airstrip and Powerline Deposits.
Table 1: Pit-Constrained Inferred Mineral Resources – AurMac Project(1)(2)(3)(4)(5)
Deposit | Gold Cut-Off
g/t |
Tonnage
Tonnes |
Average Gold Grade
g/t |
Gold Content
oz. |
Inferred | ||||
Airstrip | 0.30 | 35,243,000 | 0.75 | 845,000 |
Powerline1 | 0.30 | 312,243,000 | 0.61 | 6,158,000 |
Combined Inferred | 0.30 | 347,486,000 | 0.63 | 7,003,000 |
Notes to Table 1:
Detailed images of the Mineral Resource model, including an interactive 3D model and additional information can be found at: https://www.banyangold.com/projects/aurmac/
In addition to the AurMac Project, the Company holds the Hyland Gold Project, located 70 km Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt (the “Hyland Project“). The Hyland Project represents a sediment hosted, structurally controlled, intrusion related gold deposit, within a large land package (over 125 sq km), accessible by a network of existing gravel access roads.
Banyan trades on the TSX-Venture Exchange under the symbol “BYN” and is quoted on the OTCQB Venture Market under the symbol “BYAGF“. For more information, please visit the corporate website at www.BanyanGold.com or contact the Company.
ON BEHALF OF BANYAN GOLD CORPORATION
(signed) “Tara Christie”
Tara Christie
President & CEO
For more information, please contact:
Tara Christie • 778 928 0556 • [email protected]
Jasmine Sangria • 604 312 5610 • [email protected]
CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the adequacy or accuracy of this release.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
FORWARD LOOKING INFORMATION: This news release contains forward-looking information, which is not comprised of historical facts and is based upon the Company’s current internal expectations, estimates, projections, assumptions and beliefs. Such information can generally be identified by the use of forwarding-looking wording such as “may”, “will”, “expect”, “estimate”, “anticipate”, “intend(s)”, “believe”, “potential” and “continue” or the negative thereof or similar variations. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company’s plans for exploration and future economic studies, and statements regarding exploration expectations, prospectivity of the Company’s property interests, potential mining processes, pricing assumptions and costs ease and confidence in increasing ounces, exploration or development plans and timelines; mineral resource estimates; mineral recoveries and anticipated mining costs. Factors that could cause actual results to differ materially from such forward-looking information include uncertainties inherent in resource estimates, continuity and extent of mineralization, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the estimation of mineral resources and the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, and the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in Banyan’s public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.